How risky is changing the pacemaker?

A little. Overall the procedural risk is extremely low, however the most common and substantial serious risk is that of infection. Nationally, the risk of infection is 1 to 2%, and if infection develops after the generator change can require extraction of the entire system (surgical procedure) and a prolonged course of intravenous and a biotics.